If we look at the statistics of the breakdown of costs in the construction of a country house, it becomes obvious that most of it goes towards the installation of engineering systems. It is approximately 25-40% of the total amount of construction, but the exact percentage depends directly on the complexity of the systems themselves. Usually engineering systems in the cottage and country house are divided into 2 types: external and internal. External (outside) systems are those that are located outside the house. They are installed by certain companies, therefore the choice is almost always limited. Internal (inside) systems provide greater freedom of choice in terms of installation and contractor.
Any competent network installation begins with design. This stage will allow the customer to clearly see the network communication in the house. Despite the fact that the project is only on paper, it will identify and solve a number of contentious issues before the experts proceed directly to the installation. Well-formed project communication will save a lot of time, which in its absence would create issues with the customer. Also it will save money on the purchase of materials and will eliminate the need to perform unforeseen work.
In the preparation process the customer formulates the technical brief which becomes the basis of future development of networks and communications design. Also secondary data that is previously collected by the contractor that performs the installation is taken into account.
Network installation is performed throughout the entire construction process and is done in several stages. It begins with a "zero cycle": setting embedded parts for drainage; and ends with the installation of sanitary appliances. Internal systems are interconnected, for example; the heating system involves the use of the power supply system, and ventilation needs heat energy, etc. At this stage one needs to understand exactly where everything takes place before the contractors start the installation.
Any modern engineering system for a country house has several components: ventilation, air conditioning, drainage, heating, water supply. In all of these areas «Baltik-Company» is ready to offer a full range of activities. This not only includes the installation but also the design of the engineering systems, warranty and after-sales service. Proper condition of engineering networks and communications is the key to a comfortable and calm home life.
«Baltik-Company» provides a 2 year warranty on the installation works. For further information please contact our sales department: +7 (812) 275-60-77, +7 (812) 577-16-46
Installation services pricelist
Air conditioners installation |
|
Installation works – primary works |
Fee in roubles |
Standard wall air conditioner installation 1,5 – 3,8 kw |
9000 |
Standard wall air conditioner installation 4,0 - 6,0 kw |
9800 |
Standard wall air conditioner installation 6,2 - 7,8 kw |
11500 |
Standard wall air conditioner installation 8,0 - 11 kw |
12500 |
Standard ceiling(cassette) air conditioner installation 3 - 5 kw |
12300 |
Standard ceiling(cassette) air conditioner installation 5 - 7,8 kw |
14550 |
Standard ceiling(cassette) air conditioner installation 8 - 12 kw |
18800 |
Standard ducted air conditioning split system installation 5 - 15 kw |
from 15000 |
Tower air conditioner installation 8,0 -21 kw |
from 17000 |
Installation works – additional works |
|
Heating drainage installation |
500 |
Installation of SPDs (low temperature set) |
from 2000 |
Installing the pump (without the drain hose) |
1300 |
Canopy installation (when installing the outdoor block) |
1400 |
Outdoor block protection installation |
1900 |
Additional run without the case (up to 3 kw) |
500 |
Additional run without the case (up to 5 kw) |
600 |
Additional run without the case (up to 10 kw) |
700 |
Additional run without the case (up to 15 kw) |
1000 |
Additional run without the case (from 15 kw) |
1200 |
Additional run inside the case (up to 3 kw) |
600 |
Additional run inside the case (up to 5 kw) |
700 |
Additional run inside the case (up to 10 kw) |
800 |
Additional run inside the case (up to 15 kw) |
1200 |
Additional run inside the case (from 15 kw) |
1400 |
Drilling additional holes – per hole (d from 100mm to 600mm) |
950 |
Groove for drainage (brick), metre |
600 |
Groove for drainage (monolith), metre |
800 |
Groove for drainage (concrete), metre |
700 |
Groove for electrical cable (brick), metre |
600 |
Groove for electrical cable (concrete), metre |
700 |
Groove for electrical cable (monolith), metre |
800 |
Groove for refrigerant pipe run (brick) metre |
800 |
Groove for refrigerant pipe run (concrete) metre |
1000 |
Groove for refrigerant pipe run (monolith) metre |
1500 |
Additional electrical cable (without case) with section up to 5х2,5 mm2 |
100 |
Additional electrical cable (in the case) with section up to 5х2,5 mm2 |
230 |
Additional electrical cable (in corrugation) with section up to 5х2,5 mm2 |
180 |
Aerial platform up to 18m |
12000 |
Air conditioner dismantling up to 7,8 kw (without a run) |
3500 |
Air conditioner dismantling 8 - 10 kw (without a run) |
4100 |
Indoor block dismantling up to 7,8 kw |
1500 |
Indoor block dismantling from 8 kw |
1700 |
Outdoor block dismantling up to 7,8 kw |
2200 |
Outdoor block dismantling from 8 kw |
2400 |
Run dismantling (without case), metre |
80 |
Run dismantling (in the case), metre |
130 |
Dismantling and installing of cable bracket |
500 |
Additional drainage laying (in the case) |
230 |
Additional drainage laying (without case) |
100 |
Equipment lift (higher than Level 2, for each level), set |
100 |
Installing and dismantling of 1 m high scaffolding |
900 |
Dismantling and installing of suspended ceiling (Armstrong), m2 |
150 |
Visit outside of Ring road up to 10 km |
500 |
Visit outside of Ring road more than 10 km (per 1km) |
40 |
Air conditioner refill |
1500 |
Delivery outside of Ring road up to 10 km |
500 |
Delivery outside of Ring road more than 10 km (per 1km) |
40 |
Delivery within St. Petersburg |
From 500 |
Work-at-height specialist |
From 2900 |
Work (1 workforce a day) 1 workforce =2 people |
1500 |
Travel expenses (1 workforce ) |
1500/24 h |
Installation – installation of only indoor blocks |
|
Wall air conditioner indoor block 1,5 – 3,8 kw |
2000 |
Wall air conditioner indoor block 4,0 - 6,0 kw |
2500 |
Wall air conditioner indoor block 6,2 - 7,8 kw |
3000 |
Wall air conditioner indoor block 8,0 - 11 kw |
4000 |
Ceiling(cassette) air conditioner indoor block 3 - 5 kw |
3300 |
Ceiling(cassette) air conditioner indoor block 5,5 - 7,8 kw |
3700 |
Ceiling(cassette) air conditioner indoor block 8 - 12 kw |
5000 |
Ducted air conditioning split system indoor block 5 - 15 kw |
от 5000 |
Tower air conditioner indoor block 8,0 -21 kw |
от 7000 |
Water heater installation |
Unit of measurement |
Fee in roubles |
Standard storage water heater installation (up to 50 litters volume) |
unit |
4000 |
Standard storage water heater installation (more than 50 litters volume) |
unit |
4500 |
Standard tankless single phase water heater installation |
unit |
3000 |
Standard tankless three phase water heater installation |
unit |
3500 |
Storage water heater installation/replacement (up to 50 litters volume) at the old or prepared place |
unit |
2500 |
Storage water heater installation/replacement (more than 50 litters volume) at the old or prepared place |
unit |
3500 |
Tankless water heater installation/replacement at the old or prepared place |
unit |
2000 |
Installation works |
Fee in USD |
Fee in roubles |
Boiler installation |
||
Condensing gas boiler |
200 |
8000 |
Boiler–room turnkey works (up to 50 kw) - 1 boiler |
1000 |
40000 |
Boiler–room turnkey works (up to 100 kw) - 1 boiler |
1250 |
50000 |
Boiler–room turnkey works (up to 200 kw) - 1 boiler |
1625 |
65000 |
Boiler–room turnkey works (up to 300 kw) - 1 boiler |
1875 |
75000 |
Single walled smoke stack |
55 |
2200 |
Insulated double walled smoke stack |
75 |
3000 |
Heating system installation (per heating unit) |
||
Cooper |
110 |
4400 |
Plastic+ metal |
90 |
3600 |
Polypropylene |
95 |
3800 |
Floor heating (per 1 м2) |
30 |
1200 |
Laying insulation on the pipe |
1 |
40 |
Removing and installing of radiator for carrying out finishing works |
30 |
1200 |
Installation of collector enclosure |
30 |
1200 |
Water test |
60 |
2400 |
System refill |
80 |
3200 |
Sewerage and water supply systems installation (per point of connection) |
||
Sewerage |
45 |
1800 |
Cooper |
60 |
2400 |
Plastic + metal |
45 |
1800 |
Polypropylene |
50 |
2000 |
Tying the filter flask mechanical cleaning |
40 |
1600 |
Towel drier installation |
90 |
3600 |
Plumbing fixtures installation |
||
Flush toilet installation with connection |
50 |
2000 |
Installation of the system such as Sololift |
50 |
2000 |
Flush installation (for toilet, bidet) |
80 |
3200 |
Sink installation with connection |
50 |
2000 |
Walk–in shower installation |
100 |
4000 |
Shower tower installation |
80 |
3200 |
Commissioning works |
||
Wall mounted gas heater up to 40 kw |
100 |
4000 |
Wall mounted gas heater from 40 to 100 kw |
160 |
6500 |
Three-pass boiler up to 40 kw |
350 |
14000 |
Three-pass boiler 40-100 kw |
425 |
17000 |
Three-pass boiler 100-360 kw |
750 |
30000 |
After-sales service |
||
Annual service (condensing gas boiler) up to 40 kw |
150 |
17000 |
Annual service (condensing gas boiler) from 40-100 kw |
600 |
24000 |
Annual service (boiler up to 100 kw) |
750 |
30000 |
Annual service (boiler from 100-360 kw) |
1375 |
55000 |
Additional works |
||
One power station installation (wall outlet, breaker, switcher) |
10 |
400 |
Concrete wall drilling 15-32 d. |
unit |
500 |
Concrete wall drilling 40-100 d. |
unit |
850 |
Drilling partitions |
unit |
350 |
Cables installation in plastic pipe work, corrugation, case |
10 |
400 |
Grooving (wall chasing) for piping up to 32 mm |
15 |
600 |
Grooving (wall chasing) for piping 32...60 mm |
20 |
800 |
Grooving (wall chasing) for piping 60...110 mm |
30 |
1200 |
Technical specialist visit price list
- Technical specialist visit within St. Petersburg - 2300 rub.
- Up to 20 km – (initial rate) x 1.1
- Up to 50 km - (initial rate) x 1.2
- Up to 100 km - (initial rate) x 1.4
- Up to 150 km - (initial rate) x 1.5
- Up to 200 km - (initial rate) x 1.6
- Up to 250 km - (initial rate) x 1.7
- Up to 300 km - (initial rate) x 1.8
- More than 300 km - (initial rate) x 2.0